Status for March 6
06 Mar 2017What have I worked on?
Struggling with USB 3.0 issues on virtual machine, which is why I haven’t updated this in awhile. Found a $25 machine at the campus surplus with no OS, tossed Ubuntu on it, and am now using it to do much of my writing and day-to-day stuff. Once our cluster is back up, I should be set.
-
professionalService
: reviewed 2 articles. -
priorityEffects1
: Incorporated Brett’s changes. Have a decently solid draft. Up simulation number for final figures (tonight). Pushed along the phase plots and such, but have some questions for Brett and Alan. -
dispersalTrait
: pictures are on thebeetle
drive. Initial plots are conceptually sketched out. -
helmSize
: Folded Alonso’s edits into introduction. Tweaked figures, and worked a bit on methods and results. Good stuff. -
hostRange
: major revision requested (a reject with invitation to resubmit). 58ne of the reviews were damning, and changes should be straightforward to incorporate. -
missingLinks
: minor revisions requested. Thorough and positive reviews. Stoked to incorporate them and get this work out in the wild. -
graphDissim
: code finished running. Preliminary plots are intriguing. Need to sit down and sketch out conceptual manuscript flow. I see one clear main point, but it takes 2-3 for a manuscript to form. -
hostUtility
: new project idea. Currently pushing along conceptually. Have a simulation framework, but haven’t coded anything up yet.
What should I be working on now?
-
dispersalTrait
: beetle picture time (tonight?) -
checkerboard
: data entry, model dev, etc. -
priorityEffects1
: analytic solution for coexistence time, up simulation number, etc. (run simulations in parallel on home machine) -
thresholdDensity
: Am Nat rejected. I had high hopes. I thought we addressed reviewer concerns, but in the end they passed. Get prepared to submit to Ecology.